-
1 pantograph clearance gauge
English-German dictionary of Electrical Engineering and Electronics > pantograph clearance gauge
См. также в других словарях:
Loading gauge — The clearance between train and tunnel is often small. London Underground train at Hendon. A loading gauge defines the maximum height and width for railway vehicles and their loads to ensure safe passage through bridges, tunnels and other… … Wikipedia
Overhead lines — This article is about the transmission of electrical power to road and rail vehicles. For transmission of bulk electrical power to general consumers, see Electric power transmission. For powerlines mounted on pylons, see overhead power line.… … Wikipedia
British Rail Class 313 — A refreshed Southern Class 313 No. 313203 at Brighton on the West Coastway Line … Wikipedia
Glossary of rail terminology — Rail transport Operations Track Maintenance High speed Gauge Stations … Wikipedia
Third rail — For other uses, see Third rail (disambiguation). Third rail at the West Falls Church Metro station near Washington, D.C., electrified at 750 volts. The third rail is at the top of the image, with a white canopy above it. The two lower rails… … Wikipedia
Tool and die maker — Not to be confused with tap and die. Tool and die makers are workers in the manufacturing industry who make jigs, fixtures, dies, molds, machine tools, cutting tools (such as milling cutters and form tools), gauges, and other tools used in… … Wikipedia
Drill and tap size chart — Below is a comprehensive drill and tap size chart for all drills, imperial and metric, and taps up to 36.5 mm. Contents 1 Chart 2 See also 3 References 4 External links … Wikipedia
British Rail Class 220 — Voyager CrossCountry 220011 at Newton Abbot … Wikipedia
Common Tunnel — Grønland Station Overview Type Rapid transit … Wikipedia